Types of work to existing buildings
Contents |
[edit] Introduction
There are a number of different types of works that can be carried out on existing buildings. Some of these, the differences between them, and links ot additional information are set out below:
[edit] Alteration
Alteration is work intended to change the function or appearance of a building.
For more information see: Alteration.
[edit] Extension
Extension is the process of adding new space to a building to house additional accommodation.
For more information see: Building extension.
[edit] Fit-out
To fit-out is to provide something (or someone) with the necessary equipment or other items (clothes for people) for a particular situation or context.
For more information see: Fit out of buildings.
[edit] Refurbishment
Refurbishment is the process of improvement by cleaning, decorating and re-equipping. It may also include elements of retrofitting.
For more information see: Refurbishment.
[edit] Remediation
Remediation is the process of rectifying defects.
For more information see: Remediation.
[edit] Renovation
Renovation is the process of returning to a good state of repair - improving or modernising an old, damaged or defective building.
For more information see: Renovation.
[edit] Repurposing
Repurposing, sometimes referred to as adaptive re-use means simply to adapt something for re-use or for a new use.
For more information see: Repurposing.
[edit] Restoration
Restoration is the process of returning a building to its former state. Restoration work is most commonly undertaken on historic buildings; accurately recreating their form, features and character as they appeared at a particular time, while protecting heritage value. Decay or alterations made to a building can be reversed as part of restoration works.
For more information see: Restoration.
[edit] Retrofit
Retrofitting is providing a building with a component or feature not originally fitted. It is often used in relation to the installation of new building systems, such as heating systems, but it might also refer to the fabric of a building.
For more information see: Retrofit.
[edit] Change of use
The Town and Country Planning (Use Classes) Order categorises uses of land and buildings. Developments may not be used for purposes that are not within the use class for which they received planning permission. Changing the use of a development from one class to another may require planning permission.
For more information see: Change of use.
[edit] Deconstruction
Deconstruction is ‘construction in reverse’. As construction involves assembling and erecting buildings, so deconstruction is the complete opposite: it involves taking buildings apart piece by piece, avoiding damage to the components.
For more information see: Deconstruction.
[edit] Demolition
Demolition refers to the destruction of buildings and other artificial structures.
For more information see: Demolition.
[edit] Related articles on Designing Buildings
- Alterations to existing buildings.
- Do the building regulations apply to works to existing buildings?
- Demolition.
- Material amendment.
- Material change of use.
- Minor material amendment.
- Non material amendment.
- Change of use class.
- Planning permission.
- Permitted development.
- Renovation v refurbishment v retrofit.
- Typologies.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.