Types of work to existing buildings
Contents |
[edit] Introduction
There are a number of different types of works that can be carried out on existing buildings. Some of these, the differences between them, and links ot additional information are set out below:
[edit] Alteration
Alteration is work intended to change the function or appearance of a building.
For more information see: Alteration.
[edit] Extension
Extension is the process of adding new space to a building to house additional accommodation.
For more information see: Building extension.
[edit] Fit-out
To fit-out is to provide something (or someone) with the necessary equipment or other items (clothes for people) for a particular situation or context.
For more information see: Fit out of buildings.
[edit] Refurbishment
Refurbishment is the process of improvement by cleaning, decorating and re-equipping. It may also include elements of retrofitting.
For more information see: Refurbishment.
[edit] Remediation
Remediation is the process of rectifying defects.
For more information see: Remediation.
[edit] Renovation
Renovation is the process of returning to a good state of repair - improving or modernising an old, damaged or defective building.
For more information see: Renovation.
[edit] Repurposing
Repurposing, sometimes referred to as adaptive re-use means simply to adapt something for re-use or for a new use.
For more information see: Repurposing.
[edit] Restoration
Restoration is the process of returning a building to its former state. Restoration work is most commonly undertaken on historic buildings; accurately recreating their form, features and character as they appeared at a particular time, while protecting heritage value. Decay or alterations made to a building can be reversed as part of restoration works.
For more information see: Restoration.
[edit] Retrofit
Retrofitting is providing a building with a component or feature not originally fitted. It is often used in relation to the installation of new building systems, such as heating systems, but it might also refer to the fabric of a building.
For more information see: Retrofit.
[edit] Change of use
The Town and Country Planning (Use Classes) Order categorises uses of land and buildings. Developments may not be used for purposes that are not within the use class for which they received planning permission. Changing the use of a development from one class to another may require planning permission.
For more information see: Change of use.
[edit] Deconstruction
Deconstruction is ‘construction in reverse’. As construction involves assembling and erecting buildings, so deconstruction is the complete opposite: it involves taking buildings apart piece by piece, avoiding damage to the components.
For more information see: Deconstruction.
[edit] Demolition
Demolition refers to the destruction of buildings and other artificial structures.
For more information see: Demolition.
[edit] Related articles on Designing Buildings
- Alterations to existing buildings.
- Do the building regulations apply to works to existing buildings?
- Demolition.
- Material amendment.
- Material change of use.
- Minor material amendment.
- Non material amendment.
- Change of use class.
- Planning permission.
- Permitted development.
- Renovation v refurbishment v retrofit.
- Typologies.
Featured articles and news
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
The ISO answer to what is a digital twin
Talking about digital twins in a more consistent manner.
Top tips and risks to look out for.
New Code of Practice for fire and escape door hardware
Published by GAI and DHF.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Heritage conservation in Calgary
The triple bottom line.
College of West Anglia apprentice wins SkillELECTRIC gold.
Scottish government launch delivery plan
To strengthen planning and tackle the housing emergency.
How people react in ways which tend to restore their comfort.
Comfort is a crucial missing piece of the puzzle.
ECA launches Recharging Electrical Skills Charter in Wales
Best solutions for the industry and electrical skills in Wales.
New homebuilding skills hub launch and industry response
Working with CITB and NHBC to launch fast track training.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.